CLIMAVENETA

Projects APPLICATION
▶ Location:Home>Projects
CLIMAVENETA

Xincheng Business Hotel, Central District, Lingui New District, Guilin

Area:Guangxi System Type: Construction Area: Application Type:Hotel&Resorts Cooling Capacity:5300KW Heating Capacity:

Project:

Xincheng Business Hotel in the center of Lingui New District of Guilin adopts water-ground source heat pump unit and air-cooled water chiller, with a total cooling load of 5300KW.

Installed Units:

1 × PSRHH1902C-R-Y 2 × PSRHH3802C-R-Y 1 × ERACS2722E-N-B

Solution:

This system adopts four air-cooled chillers and water-ground source heat pump units.

Certification:

Projects

APPLICATION
Projects

Xincheng Business Hotel, Central District, Lingui New District, Guilin

Area:Guangxi System Type: Construction Area: Application Type:Hotel&Resorts Cooling Capacity:5300KW Heating Capacity:

Project:

Xincheng Business Hotel in the center of Lingui New District of Guilin adopts water-ground source heat pump unit and air-cooled water chiller, with a total cooling load of 5300KW.

System Type:

Installed Units:

1 × PSRHH1902C-R-Y 2 × PSRHH3802C-R-Y 1 × ERACS2722E-N-B

Solution:

This system adopts four air-cooled chillers and water-ground source heat pump units.

Certification: