Project:
Guangzhou No.8 People's Hospital adopts four control units and chillers, with a total cooling load of 2400KW.
System Type:
Installed Units:
2 x CSRAN1062-Q-B-Y
1 x CSRAN1562-Q-B-Y
1 x ERACS1051C-B
Solution:
This system uses four control units and water chillers, including six hosts, and the terminal uses conventional terminal equipment.This system uses four control units and water chillers, including six hosts, and the terminal uses conventional terminal equipment.
Certification: