Project:
Hunan Prison Supervision Bureau adopts water chillers with a total cooling load of 1300KW.
System Type:
Installed Units:
2 x BE/SRH3602
Solution:
In this project, two chillers are used in summer and boilers are used for heating in winter.
Certification: