CLIMAVENETA

Projects APPLICATION
▶ Location:Home>Projects
CLIMAVENETA

Hubei Xiangyang citizen center

Area:Hubei System Type: Construction Area: Application Type:Government application Cooling Capacity:2456KW Heating Capacity:

Project:

Hubei Xiangyang Civic Center project adopts water-ground source heat pump unit with a total cooling load of 2456KW.

Installed Units:

2 x PSRHH1301C-Y 2 x PSRHH2201C-Y

Solution:

This system uses four water-ground source heat pump units.

Certification:

Projects

APPLICATION
Projects

Hubei Xiangyang citizen center

Area:Hubei System Type: Construction Area: Application Type:Government application Cooling Capacity:2456KW Heating Capacity:

Project:

Hubei Xiangyang Civic Center project adopts water-ground source heat pump unit with a total cooling load of 2456KW.

System Type:

Installed Units:

2 x PSRHH1301C-Y 2 x PSRHH2201C-Y

Solution:

This system uses four water-ground source heat pump units.

Certification: