Project:
The project is located in the northwest of Huimin Street and Hanlin Road, with a building area of 220,000 square meters. The central air-conditioning system adopts five ground source heat pump units+fan coil units to realize the summer cooling and winter heating of the project. The fan coil units adopt a large temperature difference system, and the central hot water uses two ground source heat pump total heat recovery units to realize the four-season hot water supply. The external network is buried, and the air-conditioning system provides water for circulation through air-conditioning wells.
System Type:
Installed Units:
2 x PSRHH2702-R
1 x PSRHH3602
1 x AQS0071-N-DHW
2 x PSRHH7204
Terminals
Solution:
Certification: