CLIMAVENETA

Projects APPLICATION
▶ Location:Home>Projects
CLIMAVENETA

Guiyang First People's Hospital complex building

Area: System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity: Heating Capacity:

Project:

Guiyang First People's Hospital was founded in July 1919. After nearly 100 years of struggle and development, it has now become the city's first grade A general hospital integrating medical treatment, scientific research, teaching, prevention, construction protection, rehabilitation and first aid. At present, the hospital has two campuses, the main hospital is located at 97 Bo ai Road, Nanming District, Guiyang city, and the new hospital is located at Xingye South Street, Shuanglong Airport Economic Development Zone (near Longdongpu Airport), covering a total area of 176,500 square meters, a total construction area of 150,300 square meters, with 2,000 beds. There are 45 clinical and medical departments and 16 professional bases for standardized training of residents. The hospital is well equipped with international advanced medical instruments and equipment, such as GE superconducting 3.0T NUCLEAR magnetic resonance, GE gemstone energy spectrum CT(dynamic 500 row), GE cardiovascular angiography system, GE dual-energy X-ray bone density instrument, Siemens volumetric imaging ultrasound system and various endoscopic surgical equipment.

Installed Units:

Terminals

Solution:

Certification:

Projects

APPLICATION
Projects

Guiyang First People's Hospital complex building

Area: System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity: Heating Capacity:

Project:

Guiyang First People's Hospital was founded in July 1919. After nearly 100 years of struggle and development, it has now become the city's first grade A general hospital integrating medical treatment, scientific research, teaching, prevention, construction protection, rehabilitation and first aid. At present, the hospital has two campuses, the main hospital is located at 97 Bo ai Road, Nanming District, Guiyang city, and the new hospital is located at Xingye South Street, Shuanglong Airport Economic Development Zone (near Longdongpu Airport), covering a total area of 176,500 square meters, a total construction area of 150,300 square meters, with 2,000 beds. There are 45 clinical and medical departments and 16 professional bases for standardized training of residents. The hospital is well equipped with international advanced medical instruments and equipment, such as GE superconducting 3.0T NUCLEAR magnetic resonance, GE gemstone energy spectrum CT(dynamic 500 row), GE cardiovascular angiography system, GE dual-energy X-ray bone density instrument, Siemens volumetric imaging ultrasound system and various endoscopic surgical equipment.

System Type:

Installed Units:

Terminals

Solution:

Certification: