Project:
This project is a landmark building in Datong Yu East District. It provides air conditioning service for the owner in summer and central heating in winter from the municipal heat network. In order to save operation cost to the maximum extent, Party A decides to adopt frequency conversion maglev centrifugal water cooling chiller with extremely high partial load performance as refrigeration unit
System Type:
Installed Units:
3X TECS-W7504L-E
Solution:
This project is a landmark building in Datong Yu East District. It provides air conditioning service for the owner in summer and central heating in winter from the municipal heat network. In order to save operation cost to the maximum extent, Party A decides to adopt frequency conversion maglev centrifugal water cooling chiller with extremely high partial load performance as refrigeration unit
Certification: