Shijingshan High Inspection Institute 582 project of Beijing

Area:Beijing System Type: Construction Area: Application Type:Office Buildings Cooling Capacity:2650kW Heating Capacity:

Project:

The data center of Shijingshan High Inspection Institute 582 Project adopts natural cooling air-cooled water chiller, and the auxiliary building adopts conventional air-cooled water chiller, with a total cooling load of 2650kW.

Installed Units:

3X CSRAT2602-FC-NG-B-Y 2X ERACS0951C-B

Solution:

The data center of Shijingshan High Inspection Institute 582 Project adopts Clemente's overall solution, cold source + room air conditioning, in which the cold source part adopts natural cooling air-cooled chiller to provide the required cooling load for the data center; The auxiliary building adopts conventional air-cooled chillers to provide the daily cooling load for the project

Certification:

Projects

APPLICATION
Projects

Shijingshan High Inspection Institute 582 project of Beijing

Area:Beijing System Type: Construction Area: Application Type:Office Buildings Cooling Capacity:2650kW Heating Capacity:

Project:

The data center of Shijingshan High Inspection Institute 582 Project adopts natural cooling air-cooled water chiller, and the auxiliary building adopts conventional air-cooled water chiller, with a total cooling load of 2650kW.

System Type:

Installed Units:

3X CSRAT2602-FC-NG-B-Y 2X ERACS0951C-B

Solution:

The data center of Shijingshan High Inspection Institute 582 Project adopts Clemente's overall solution, cold source + room air conditioning, in which the cold source part adopts natural cooling air-cooled chiller to provide the required cooling load for the data center; The auxiliary building adopts conventional air-cooled chillers to provide the daily cooling load for the project

Certification: