Project:
The data center of Shijingshan High Inspection Institute 582 Project adopts natural cooling air-cooled water chiller, and the auxiliary building adopts conventional air-cooled water chiller, with a total cooling load of 2650kW.
System Type:
Installed Units:
3X CSRAT2602-FC-NG-B-Y
2X ERACS0951C-B
Solution:
The data center of Shijingshan High Inspection Institute 582 Project adopts Clemente's overall solution, cold source + room air conditioning, in which the cold source part adopts natural cooling air-cooled chiller to provide the required cooling load for the data center; The auxiliary building adopts conventional air-cooled chillers to provide the daily cooling load for the project
Certification: