Project:
The project is the outpatient building of Zhangjiagang First People's Hospital. The cold source is provided by air-cooled chiller and heat source boiler
System Type:
Installed Units:
2X ERACS2652C-B
Solution:
Air cooled cold water air conditioning unit with boiler heating, unit model: ERACS2652C-B *2 Total cooling load: 1800,
Certification: