Shanghai Tenth People's Hospital

Area:Shanghai System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:2934kW Heating Capacity:3358kW

Project:

Shanghai No. 10 People's Hospital adopts air-cooled heat pump units with a total cooling load of 2934kW and a total heat load of 3358kW.

Installed Units:

3x CSRAN2442-Q-B 4x AQS0412-Q-B "

Solution:

Air cooled heat pump units are provided for the project, including 3 sets CSRAN2442-Q-B and 4 sets AQS0412-Q-B

Certification:

Projects

APPLICATION
Projects

Shanghai Tenth People's Hospital

Area:Shanghai System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:2934kW Heating Capacity:3358kW

Project:

Shanghai No. 10 People's Hospital adopts air-cooled heat pump units with a total cooling load of 2934kW and a total heat load of 3358kW.

System Type:

Installed Units:

3x CSRAN2442-Q-B 4x AQS0412-Q-B "

Solution:

Air cooled heat pump units are provided for the project, including 3 sets CSRAN2442-Q-B and 4 sets AQS0412-Q-B

Certification: