beijing Miyun Gubei Shui Town

Area:Beijing System Type: Construction Area: Application Type:Residential buildings Cooling Capacity:5100kW Heating Capacity:5600kW

Project:

Beijing Miyun Gubei Water Town is a comprehensive and characteristic leisure international tourist holiday destination integrating sightseeing, leisure vacation, business exhibition, creative culture and other tourism formats。Total cooling load 5100KW, total heat load 5600KW

Installed Units:

2x Eracs 2422-SL 2x CSRAN1062-Y-SL 16x AQS 0182-N-LN 4x CSRAN 1562-Y-B 2x Eracs 3222-SL 1x Eracs 2722-SL

Solution:

The project requires a total cooling load of 5100KW and a total heat load of 5600KW. We provide the following units: 2 sets OF ERACS 2422-SL, 2 sets of CSRAN1062-Y-SL, 2 sets of AQS 0182-N-LN, 16 sets of CSRAN 1562-Y-B, 4 sets of ERACS 3222-SL, 2 sets of ERACS 2722-SL,1

Certification:

Projects

APPLICATION
Projects

beijing Miyun Gubei Shui Town

Area:Beijing System Type: Construction Area: Application Type:Residential buildings Cooling Capacity:5100kW Heating Capacity:5600kW

Project:

Beijing Miyun Gubei Water Town is a comprehensive and characteristic leisure international tourist holiday destination integrating sightseeing, leisure vacation, business exhibition, creative culture and other tourism formats。Total cooling load 5100KW, total heat load 5600KW

System Type:

Installed Units:

2x Eracs 2422-SL 2x CSRAN1062-Y-SL 16x AQS 0182-N-LN 4x CSRAN 1562-Y-B 2x Eracs 3222-SL 1x Eracs 2722-SL

Solution:

The project requires a total cooling load of 5100KW and a total heat load of 5600KW. We provide the following units: 2 sets OF ERACS 2422-SL, 2 sets of CSRAN1062-Y-SL, 2 sets of AQS 0182-N-LN, 16 sets of CSRAN 1562-Y-B, 4 sets of ERACS 3222-SL, 2 sets of ERACS 2722-SL,1

Certification: