National China Film Digital Production Base

Area:Beijing System Type: Construction Area: Application Type:Office Buildings Cooling Capacity:13400kW Heating Capacity:15400kW

Project:

China Film Group digital film production base adopts water ground source heat pump unit with ground source heat, with a total cooling load of 13,400kW and a total heat load of 15,400kW.

Installed Units:

1×PSRHH 3602-Y 1×PSRHH6404-Y 2×PSRHH9604-D-Y 1×PSRHH6804-D-Y

Solution:

This project is located in the suburbs and there is no other heat source, so a total of 5 water and ground source heat pump units are used, with wind disk, air conditioning and radiator terminals.

Certification:

Projects

APPLICATION
Projects

National China Film Digital Production Base

Area:Beijing System Type: Construction Area: Application Type:Office Buildings Cooling Capacity:13400kW Heating Capacity:15400kW

Project:

China Film Group digital film production base adopts water ground source heat pump unit with ground source heat, with a total cooling load of 13,400kW and a total heat load of 15,400kW.

System Type:

Installed Units:

1×PSRHH 3602-Y 1×PSRHH6404-Y 2×PSRHH9604-D-Y 1×PSRHH6804-D-Y

Solution:

This project is located in the suburbs and there is no other heat source, so a total of 5 water and ground source heat pump units are used, with wind disk, air conditioning and radiator terminals.

Certification: