CLIMAVENETA

Projects APPLICATION
▶ Location:Home>Projects
CLIMAVENETA

Jiading District Maternal and Child Health Care Hospital

Area:Shanghai System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:1620kW Heating Capacity:1680kW

Project:

The maternal and child Health Hospital of Jiading District adopts modular air-cooled heat pump units with a total cooling load of 1620kW and a total heat load of 1680kW.

Installed Units:

3X AQS130M-N-E 9X AQS130S-N-E

Solution:

The project adopts modular air-cooled heat pump units aqS130M-N-E (3 sets) and AQS130S-N-E (9 sets)

Certification:

Projects

APPLICATION
Projects

Jiading District Maternal and Child Health Care Hospital

Area:Shanghai System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:1620kW Heating Capacity:1680kW

Project:

The maternal and child Health Hospital of Jiading District adopts modular air-cooled heat pump units with a total cooling load of 1620kW and a total heat load of 1680kW.

System Type:

Installed Units:

3X AQS130M-N-E 9X AQS130S-N-E

Solution:

The project adopts modular air-cooled heat pump units aqS130M-N-E (3 sets) and AQS130S-N-E (9 sets)

Certification: