CLIMAVENETA

Products PRODUCT
▶ Location:Home>Products> Free cooling computer room air conditioner
Beijing Huitianyun Project

Beijing Huitianyun Project

Area:Beijing
Cooling Capacity:58980kW
Period:2016
Heating Capacity:
Building Function:Data Center
System:
Installed Units:
194 x SCU100 36 x SCU025 191 x SCU140
State Grid Corporation Beijing Disaster Recovery Center

State Grid Corporation Beijing Disaster Recovery Center

Area:Beijing
Cooling Capacity:11040kW
Period:2014
Heating Capacity:
Building Function:Data Center
System:
Installed Units:
12 x SCU120 48 x SCU200
Beijing Sinnet Technology Co., Ltd.

Beijing Sinnet Technology Co., Ltd.

Area:Shanghai
Cooling Capacity:12710kW
Period:2015
Heating Capacity:
Building Function:Data Center
System:
Installed Units:
82 x SCU155B
China Unicom National Data Center Beijing Yizhuang IDC room

China Unicom National Data Center Beijing Yizhuang IDC room

Area:Beijing
Cooling Capacity:2120kW
Period:2012
Heating Capacity:
Building Function:Data Center
System:
Installed Units:
23×DWU080F 23×BDC103 3×DWU060F 3×BDC078 2×DWU050F 2×BDC062
BEIJING SINNET TECHNOLOGY CO., LTD.  (2015)

BEIJING SINNET TECHNOLOGY CO., LTD. (2015)

Area:Beijing
Cooling Capacity:7248kW
Period:2015
Heating Capacity:
Building Function:Data Center
System:
Installed Units:
48×SCU100 12×SCU160
Learn More > >

Products

PRODUCT
Free cooling computer room air conditioner
特点
CLIMAVENETA
  • Features
  • Technical Data
  • Projects
  • Download
  • Other
Changji Yanyue Bay

Changji Yanyue Bay

Area:Henan Period:2018 Building Function:Residential buildings System: Cooling Capacity:11111.5kW Heating Capacity:14642.7kW
Installed Units:

1 x PSRHH4802-Y-R 1 x PSRHH4502-Y-R 1 x PSRHH5103 1 x PSRHH5003.C-Y 1 x PSRHH9004.C-Y 3x PSRHH2401M

Qianshan Old Village

Qianshan Old Village

Area:Guangdong Period:2014 Building Function:Residential buildings System: Cooling Capacity:22950kW Heating Capacity:7080kW
Installed Units:

1 x FOCSWATER4102 3 x FOCSWATER6004C 3 x KMC800LH 3 x PSRHH6003C-R-Y

Zhengzhou Olympic Sports Center

Zhengzhou Olympic Sports Center

Area:Henan‎ Period:2018 Building Function:Sport structures System: Cooling Capacity:15509kw Heating Capacity:
Installed Units:

1 x KMC-1100LY-INV 1 x KMC1100LY 2 x KMC-1100LY-D 1 x CCS0500-INV 2 x CCS0500-INV 2 x FOCSWATER2501

Five Pine Ice Sports Center

Five Pine Ice Sports Center

Area:Beijing‎ Period:2019 Building Function:Sport structures System: Cooling Capacity:4600kW Heating Capacity:
Installed Units:

3 x TECS-W4503L-E

‎State Grid Chongqing Zhiwang Science and Technology Comprehensive Office Building‎

‎State Grid Chongqing Zhiwang Science and Technology Comprehensive Office Building‎

Area:Chongqing‎ Period:2021 Building Function:Office Buildings System: Cooling Capacity:4800kW Heating Capacity:5000kW
Installed Units:

2 x ERACS3622E-N-D-B 1 x ERACS3602E-N-B 2 x ERACS3622E-N-B 52 x MFC 900 x FCU